In the dynamic world of construction and real estate development, unforeseen challenges often become valuable learning opportunities. Today, I'd like to share a recent incident that underscores the importance of proactive planning in managing water supply systems in large construction projects.

The Challenge: Inadequate Water Pressure and Flow

At one of our key projects, we encountered a significant issue: the existing water supply from the main line was insufficient to support our building's fire sprinkler system, particularly for the parking garage area. The crux of the problem was two-fold:

  • Inadequate Pressure: Despite efforts to increase pressure with a fire pump, the overall water flow was compromised.

  • Theoretical vs. Actual Data: The data from Los Angeles Department of Water and Power (LADWP) was theoretical, leaving us without a precise understanding of actual pressures and flows until system testing.

This situation posed a risk, not only to project timelines but, more critically, to safety standards mandated by the National Fire Protection Association (NFPA) and LADWP.

Innovative Solutions: Beyond the Conventional

Addressing this issue required thinking beyond conventional solutions. Our solutions involved:

  1. Installation of a 33,000-Gallon Water Tank: This tank, sized for 60 minutes of operation at 550 gallons per minute, ensures adequate water volume for the sprinkler system. It’s absolutely massive and could be a project killer on smaller projects. It also could cost approx $450K.

  2. Upgrading LADWPs main line: The main line is very old and only 6 inches, which doesn’t provide the flow we need. We could upgrade the main line to an 8 inch line which would increase pressure and the flow. This would require 340 linear feet of new line paired with a substantial amount of excavation. Total cost approx $300K

  3. Upgrading the Fire Pump System: Shifting from an in-line or horizontal pump to a vertical turbine pump with tank overflow and an automatic tank fill system.

  4. Anticipating Regulatory Requirements: The Los Angeles Department of Building and Safety (LADBS) may mandate sizing the water tank for the most demanding system – the standpipe system. This changes the equation to a 45,000-gallon tank (60min x 750 gpm), impacting both the tank size and fire pump system demands.

Key Takeaways and Best Practices

We decided the best solution would be to upgrade the main line to 8 inches, an unfortunate and substantial change order. This experience has reinforced several best practices for managing construction projects:

  • Early Testing and Verification: Validate theoretical data with actual tests as early as possible.

  • Flexibility in Design: Be prepared to adapt systems and components to meet unexpected demands.

  • Regulatory Awareness: Stay informed about local regulations to ensure compliance and avoid delays.

Conclusion: Turning Challenges Into Opportunities

In construction, every challenge brings an opportunity to learn, innovate, and improve. By sharing these insights, I hope to foster a community where we can all grow and succeed together.