• The Vertical
  • Posts
  • Understanding Soft Costs: A Developer's Guide to 5-Unit Townhome Projects in West LA

Understanding Soft Costs: A Developer's Guide to 5-Unit Townhome Projects in West LA

Introduction

In the complex world of real estate development, particularly in Los Angeles's competitive Westside market, understanding soft costs is crucial for project success. This newsletter breaks down each component of soft costs for a 5-unit townhome development, providing insights into why these expenses are necessary and how they're calculated.

Design and Engineering Costs

Architectural Services: $75,000

The cornerstone of any development project, architectural services in West LA command premium rates due to the area's stringent design requirements and complex approval processes. This fee typically covers:

 Initial concept development

 Design development

 Construction documents

 Building department submittal packages

 Construction administration

At $15,000 per unit, this reflects the high-end nature of Westside properties and the detailed attention required for luxury townhome designs.

Land Use Consultant: $15,000

A critical player in navigating LA's complex zoning landscape:

 Zoning analysis and compliance review

 Entitlement strategy development

 Processing the entitlement

 Community outreach support

This fee represents approximately 50- 70 hours of professional consultation at market rates.

Survey and Site Planning

Topographic Survey: $8,000

Essential for accurate site planning, this cost includes:

 Detailed site elevation mapping

 Property boundary verification

 Existing structure and utility location

 Tree and significant feature documentation

Construction Surveying: $12,000

Ongoing surveying throughout construction ensures precise building placement:

 Building layout and staking

 Grade verification

 As-built documentation

This cost reflects multiple site visits throughout the construction process.

Engineering Services

Grading Plans: $10,000

Critical for site preparation and drainage:

 Cut and fill calculations

 Drainage design

 Erosion control planning

 Retaining wall integration

Tract Map/Final Map: $15,000

A crucial document for multi-unit developments:

 Property subdivision documentation

 Legal descriptions

 Easement delineation

 City review and approval process

This cost includes multiple revisions and coordination with city departments.

Structural Engineering: $25,000

At $5,000 per unit, this covers:

 Foundation design

 Framing plans

 Seismic calculations

 Structural details and specifications

MEP Engineering: $25,000

Mechanical, Electrical, and Plumbing design includes:

 HVAC systems design

 Electrical distribution plans

 Plumbing system layout

 Title 24 energy calculations

Landscape Architecture: $10,000

Covers all exterior design elements:

 Plant selection and placement

 Irrigation design

 Hardscape design

 Compliance with local drought-resistant requirements

Inspections and Reports

Soils (Geotechnical Report): $10,000

Comprehensive soil analysis including:

 Soil boring and testing

 Foundation recommendations

 Seismic hazard evaluation

 Grading recommendations

Soils Deputy Inspections: $12,000

On-site verification throughout construction:

 Soil compaction testing

 Foundation excavation inspection

 Backfill monitoring

 Final grading verification

Deputy Inspections: $20,000

Regular third-party inspections covering:

 Structural elements

 Fire/life safety systems

 Mechanical systems

 Electrical installations

Third Party Reports: $10,000

Environmental and impact studies:

 Noise study

 Air quality analysis

 Traffic impact study

These reports are oftentimes a requirement for entitlement approval.

Regulatory Fees and Requirements

Parks and Recreation Fee: $85,300

This substantial fee ($17,060 per unit) funds local park development and maintenance:

 Based on number of dwelling units

 Unit square footage

 Local park need assessment

This fee is non-negotiable and typical for LA developments.

Linkage Fees: $218,850.79

Calculated at $22.15 per square foot for residential development:

 Supports affordable housing initiatives

 Based on total project square footage (approximately 9,880 sq ft)

 Varies by market area

 Required for most new construction projects that don’t provide affordable housing

School Fees: $40,312.06

Calculated at approximately $4.08 per square foot:

 Based on total developed square footage

 Required for all new residential construction

 Collected prior to building permit issuance

Entitlement Fees: $25,000

Covers various city processing fees:

 Planning department review

Plan Check Fees: $10,000

Building department review fees:

 Initial plan check

 Correction verification

 Final approval process

 Permit processing

Permit Fees: $10,000

Various construction permits:

 Building permits

 Mechanical permits

 Electrical permits

 Plumbing permits

Utility Fees: $75,000

Connection and capacity fees:

 Water meter installation

 Sewer connection

 Power service

 Gas service installation

Project Management and Marketing

Development Fee (6%): $370,000

This fee compensates the developer for:

 Project oversight and coordination

 Risk management

 Financial planning and monitoring

 Stakeholder communication

The 6% rate reflects the project's complexity and market standards.

Marketing: $92,500

At $18,500 per unit, this comprehensive marketing budget covers:

 Professional photography and videography

 Virtual tours and 3D renderings

 Digital and print advertising

 Broker events and open houses

This investment reflects the luxury nature of Westside properties.

Interior Design: $20,000

This allocation provides:

 Material and finish selection

 Color scheme development

 Lighting design

 Common area design

At $4,000 per unit, this ensures competitive market positioning.

Administrative and Insurance

Covers essential business operations:

 Contract review and preparation

 Entity formation and maintenance

 Compliance documentation

 Risk management

 Any easements, HOA set up, CC&Rs

Insurance: $25,000

Comprehensive coverage including:

 Builder's risk insurance

 General liability

 Professional liability

 Property coverage

Contingency Planning

Project Contingency: $43,698.14

This represents approximately 5% of soft costs:

 Covers unexpected expenses

 Accounts for potential delays

 Provides buffer for market changes This conservative contingency reflects current market volatility.

Expert Consultation Services

JDJ Consulting Group

As you navigate the complex landscape of Los Angeles development, having experienced professionals on your team is crucial. JDJ Consulting Group specializes in:

 Land Use Consultation

 Permit Expediting

 Development Advisory Services

 Project Feasibility Analysis

With deep expertise in Los Angeles development regulations and processes, JDJ

Conclusion

Understanding and accurately budgeting these costs is crucial for project success and profitability.

Note: All costs are estimates based on current market conditions in West Los Angeles and may vary based on specific project requirements, market changes, and regulatory updates.